Sauna: Landscaping
With the electrical rough-in for the sauna inspection approved, we could move onto the next phase of building our sauna: landscaping. The thing needed a foundation. After another not-insignificant amount of work, we're at last ready to build the thing...
Backing up a bit, to April this year, we stayed with friends in a house outside of Lander, CA for a week during Spring break. The gal who owned the place had done a nice job with the design, and K loved the large pavers she had that made up the back deck.
K had a plan. Fast-forward a few months when we got sauna fever this summer after seeing the one we ended up purchasing go on sale at Costco. We immediately knew where we'd put it and the foundation we'd build for it. Big, offset pavers.
As a reminder, this is how that corner looked last month:
We had our work cut out for us even at that point, which was after we had already cut down a 40' tall corkscrew willow, leveled the lower tier and dug out all the grass. First step: With the electrical signed off we could fill in the trench and complete the small retaining wall. We had also already replaced that ugly, beetle-infested willow with a much smaller Japanese maple along with a yucca (inspired by that house in the Sonoran desert).
To build the wall, we picked up a bunch of pavers, toppers, landscaping caulk (to hold everything together), and a diamond-blade for our trusty, 30-some-year-old-now yardsale circular saw. Then got to work.
To cut the end bricks, I'd take two passes with the circ saw, the first about half the blade's depth and the second the full blade depth, hosing down the brick with water before each pass. Depending on the cut, I'd at least do this on the top and bottom of the brick. Even at full blade depth, those opposing cuts didn't quite cut the brick clean, but it was an easy final step to use a cold chisel and break it along what was left.
With the retaining wall complete, we could backfill it and start to level the much larger area where we'd be pouring the concrete pavers and on which the sauna is going to be built. This is maybe K's happy place, digging in the dirt.
While she did that, I took wheelbarrow after wheelbarrow full of dirt and hauled it, 5-gallon bucket by 5-gallon bucket, up our hill. This, we both joke, is why we don't bother with gym memberships.
Once enough soil had been removed and we were down to the compact subsoil, we started leveling the entire area. On our hands and knees. I actually enjoy the meticulousness of this part of the job, and I've been largely responsible for leveling every area K has dug out around our property, heh.
It felt good getting to this point, even though we had a significant job ahead of us: pouring a shitton of concrete. Before doing that, I had to measure, cut, and build all of the 2x forms. That took a solid day, interrupted by a quick day trip to Seattle for a night before K's birthday dinner out and Tinlicker concert at Showbox Sodo while her parents had the kiddos. It was an awesome show.
After our now traditional post-midnight stop at the Dick's near her parents house, we grabbed the kids and hit the road for home. Despite loving her parents and being grateful for all of their support, she wanted to wake up on her birthday in our home. We pulled in just shy of 4am, then we were up the next day finishing the forms so we could pour some concrete. Happy birthday, love!
There were two tricky parts about our form construction worth noting:
- After some back and forth with ChatGPT, I opted to build them as one ginormous form rather than individual boxes, which meant I had to figure out how to put it together so we could remove all the pieces once the concrete had set
- Like we did with our deck extension at this same time last year, we picked up the offset 5º angle of our primary bedroom in the form design, which meant I had to figure out the angles and measurements for the sections of those two form columns (columns, as if looking down on them from above)
Thankfully, a friend from work had a concrete mixer he offered us. I'm not gonna lie: despite it being incredibly awkward to load with two 80-lb bags per mix, it saved us an unimaginable amount of time over the alternative of mixing individual bags by hand in a wheelbarrow. In the end, we ended up mixing about sixty bags of concrete.
For this project, we ordered two pallets (80 bags total) of Sakrete High Strength mix, then picked up a smattering of necessary tools:
- 16" magnesium float (to push down the aggregate and pull up the creme)
- 3/8" edger
- 24" broom